AMT SpaceStation K-7 Manual Download Page 1

AMT644 / AMT645

IMPORTANT!

READ THESE POINTS BEFORE YOU BEGIN

POWER UNIT & STRUTS

MAIN HULL

MAIN FUSELAGE

ENTERPRISE STAND

12

11

14

13

MAIN HOUSING

(Upper)

ANTENNA

MAIN HOUSING

TOWER (Clear)

MAIN HOUSING

(Lower)

2

3

1

101

4

5

6

1

2

3

MINIATURE U.S.S. ENTERPRISE

 SPACE SHIP INCLUDED

103

102

5

4

EXTENSION TOWER

THREE REQUIRED (Clear)

EXTENSION (Upper) 3 REQ’D

EXTENSION (LOWER) 3 REQ’D

EXTENSION LIGHTS

THREE REQUIRED (Clear)

(One each)

It is recommended to paint sub-assemblies 

before final assembly.

Scrape paint away from surfaces to be 

cemented together.

Assemble parts in the order shown, starting 

with assembly 1.

TEST FIT all parts before cementing. 

Trim excess plastic from parts before joining.

Cement all parts unless otherwise indicated       

by the instructions.

Use paint and cement made for styrene          

plastic only.

NOTE: Remove plastic 

bar between        

power units

TM

Reviews: