
13
240GT54/nrg240GT54
Amphenol Network Solutions
All rights reserved. 6.5.2020 150567
509.926.6000
— amphenol-ns.com.com
2.2.1 Mounting Brackets
1. The mounting brackets can be installed in 6 positions, from flush to 5 inch offset in 1 inch increments. Use
included hardware to install the mounting brackets. Both 19” and 23” mounting brackets are included.
2.
Tighten screws to 20 in/lb. (2.23 N•m).
2.2.2 Tie Bar Installation and Optional 4 Post Mounting Bracket (-C Versions)
3. Use included undercut hardware to install tie bar. Standard tie bar is included in -C connectorized panels.
4. Tighten screws to 20 in/l
b. (2.3 N•m).
Fig. 2-1: Installing Mounting Brackets
Fig. 2-2: Installing -C Tie Bar