6
AMPW 400-1000L I&O Manual
. Read Before Proceeding
(continued)
I. Factory Test and Inspections
1. Prior to shipment, final air-fuel adjustments are
performed by factory trained service personnel
on each appliance. The factory emissions report
is posted on the back of the front jacket panel as
a reference for troubleshooting and maintenance.
2. In addition, the following tests and inspections
are performed to ensure the appliance meets our
highest safety and performance standards:
Operating test
Construction inspection
Electrical components inspection
Crating inspection.
J. Disclaimers and Local Codes
1. Installation must conform to the requirements of
the authority having jurisdiction. In the absence of
such requirements, installation must conform to
the
National Fuel Gas Code, NFPA 54/ANSI Z223.1,
and/ or CSA B149.1 Natural Gas and Propane Code
.
Where required by the authority having jurisdiction,
the installation must conform to the
Standard for
Controls and Safety Devices for Automatically Fired
Boilers, ANSI/ ASME CSD-1
.
2. Installation, start-up, and maintenance of this
equipment can be hazardous and requires trained,
qualified installers and service personnel. Do not
install, operate, service or repair any components
of this equipment unless you are qualified and fully
understand all requirements and procedures.
3. This instruction manual is an integral part of the
product and must be retained by the person in
charge of the appliance operation, service, and
maintenance.
WARNING
WARNING
This product can expose you to chemicals, includ
-
ing chromium, which are known to the state of
California to cause cancer and birth defects or
other reproductive harm. For more information
go to: www. P65Warnings.ca.gov.
!
WARNING
WARNING
Should overheating occur or the gas supply fail to
shut off, turn off the manual gas control valve to
the appliance.
!