•
Use a crane to lift the ma chine about 15–20 cm.
•
Po si tion the pro tec tion plate (
3
) un der the ma chine and hang it
in the base plate on both sides.
•
In stall the fas ten ing nuts (
4
) with the clamp ing bolts on both
sides, and screw them on slightly — do not tighten.
•
Align the pro tec tion plate cen trally and lower the ma chine.
•
Firmly tighten the rear fas ten ing nuts and lift the ma chine a bit
again.
•
Tense the pro tec tion plate uni formly by tight en ing the ad just -
ment screw. The gap be tween the base plate and pro tec tion
plate should be about 4–5 mm.
•
Lower the ma chine.
•
Tighten the coun ter-nuts and front fas ten ing nuts.
A
1
2
0
2
0
0
0
0-
2
H
b
m
G
g
n
ut
h
ci
dr
e
V
n
n
a
m
m
A
8
1
0
2/
8
0
3. Op er a tion
73