•
Park the ma chi ne on a le vel sur fa ce, and turn off the en gi ne.
•
Loo sen the coun ter-nuts (
2
) of the clam ping bolts (
1
) and turn
the clam ping bolts back a bit.
•
Use a cra ne to lift the ma chi ne about 15–20 cm | 6–8 in.
•
Po si tion the pro tec tion plate (
3
) un der the ma chine and hang it
in the base plate on both sides.
•
In stall the fas te ning nuts (
4
) with the clam ping bolts on both si -
des, and screw them on slight ly — do not tighten.
•
Align the pro tec ti on pla te cen tral ly and lo wer the ma chi ne.
L
M
7
5
0
2
0
0
0
0-
2
H
b
m
G
g
n
u t
h
ci
dr
e
V
n
n
a
m
m
A
©
9
1
0
2/
0
1
3. Ope ra ti on
61
Summary of Contents for APR 22/40
Page 2: ......
Page 4: ...L M 7 5 0 2 0 0 0 0 2 H b m G g n u t h c i d r e V n n a m m A 9 1 0 2 0 1...
Page 50: ......
Page 94: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......