Personnel and Equipment Safety Information
This section describes important safety information to avoid personal injury and damage to the equipment
while installing, operating, maintaining, or servicing the equipment. All safety regulations, standards, and
procedures at the analyzer location must be followed.
All personnel involved with the installation, start-up, operation, maintenance, service, or troubleshooting
of the IPS-4 Analyzer must review and follow these Warnings and Cautions.
Warnings
Review and follow these Warnings to avoid personal injury or environmental contamination.
Always disconnect main AC power and/or external power sources to the analyzer before
opening any covers or doors on the analyzer to check or perform maintenance on any compo-
nents within the enclosures.
If it is necessary to open the analyzer’s covers or doors while the circuits are live, test the
area for flammable gases (and proceed only when the area is safe).
Purged Analyzer (Hazardous Location) Applications
To work on the analyzer with it powered up and its Electronics Enclosure door open, the
Purge Bypass Switch must be in the “
BYPASS
” position.
When the Electronics Enclosure door is open, take appropriate precautions to avoid electrical
shock. Hazardous voltages are present inside.
All electrical connections, adjustments, or servicing of the analyzer should be performed only
by properly trained and qualified personnel.
All electrical connections, materials, and methods (plus all safety policies and procedures)
must be made in compliance with local wiring regulations and electrical code for the hazard-
ous area.
Follow appropriate regulatory and/or company procedures to lock out the analyzer while
working on the analyzer electronics.
Before working on the sample system, confirm that the system has been purged with Zero fluid
and is isolated (blocked in) from the process.
!
WARNING
!
WARNING
!
WARNING
!
WARNING
x | IPS-4 Dual Bench (UV / IR) Analyzer
Summary of Contents for Western Research IPS-4
Page 48: ...2 18 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 140: ...4 48 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 172: ...5 32 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 178: ...6 6 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 218: ...A 2 IPS 4 Dual Bench UV IR Analyzer Analyzer Light Path UV Optical Bench Schematic...
Page 219: ...Appendix A Drawings A 3 Analyzer Light Path NDIR Optical Bench Schematic CONDENSING...
Page 222: ...A 6 IPS 4 Dual Bench UV IR Analyzer Detector Board 100 2046...
Page 223: ...Appendix A Drawings A 7 Display Interface Board 100 2049...
Page 225: ...Appendix A Drawings A 9 AC Disconnection Board 100 2077...
Page 227: ...Appendix A Drawings A 11 Relay Board 100 2050...
Page 228: ...A 12 IPS 4 Dual Bench UV IR Analyzer Analog Board 100 2047...
Page 229: ...Appendix A Drawings A 13 MCU Board 100 2045...
Page 230: ...A 14 IPS 4 Dual Bench UV IR Analyzer Xenon Lamp Power Supply Board 100 2061 UV Optical Bench...
Page 231: ...Appendix A Drawings A 15 Infrared Source Assembly Interface Board 100 2838 IR Optical Bench...
Page 232: ...A 16 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 1 of 5...
Page 233: ...Appendix A Drawings A 17 Electronics Enclosure Wiring Diagram Sheet 2 of 5...
Page 234: ...A 18 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 3 of 5...
Page 235: ...Appendix A Drawings A 19 Disconnect Enclosure Wiring Diagram Sheet 4 of 5...
Page 236: ...A 20 IPS 4 Dual Bench UV IR Analyzer Disconnect Enclosure Wiring Diagram Sheet 5 of 5...
Page 238: ...S 2 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...