3-14 | Thermox WDG-V / VC / VCM with Blow Back
Figure 3-14. RCU mounting dimensions - O
2
-only.
Standard RCU
Make the following calibration gas connections to the standard RCU. Fig-
ure 3-14 shows standard RCU calibration gas connections:
1. Connect instrument grade air that is free of oil or dirt to the instru-
ment air inlet connection on the left side of the RCU. If you are also
using instrument air as your span gas, you can skip Step 2 below
because instrument air will be used for both aspirator air and the span
calibration gas.
2. If you wish to use a span gas other than instrument air, you must
purchase the optional alternate span gas kit. Connect the span gas to
the alternate span gas inlet on the RCU if your span gas is other than
instrument air.
3. Connect the O
2
zero calibration gas to the O
2
zero gas inlet connection
on the RCU.
4. Connect the calibration gas outlet on the right side of the RCU to the
calibration gas inlet on the sensor -see Figure 3-9 for the calibration gas
inlet connection on the WDG-V sensor. Also, be sure to install the sup-
plied check valve as close to the sensor as possible - note the orienta-
tion of the valve.
5. Connect the aspirator air outlet on the RCU to the aspirator air inlet
connection on the sensor.
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...