3-12 | Thermox WDG-V / VC / VCM with Blow Back
330.20
13.00
481.47
18.96
4.79
121.56
(2) 1/2” (12.7mm) conduit entries
One supplied with plug
Electronics Section
Drain Valve
Calibration Gas Inlet
1/4” compression fitting
Plug during normal operations.
when calibrating shut off
aspirator air
Blow Back Regulator
Set to 80-90 PSI
Instrument Air Inlet
1/4” compression fitting
Minimum 80 PSI for blow back
Figure 3-13. Sensor Inlet Connections (Floor Mount).
Manual Calibration and Aspirator Air Connections
If you have a remote calibration unit (RCU), skip the remainder of
this section and proceed to the “RCU Mechanical Installation” sec-
tion.
Aspirator air connection
If you have an AMEVision Display User Interface, you can use the
flow gauge to set the flow as described in Chapter 5.
• Connect aspirator air to the aspirator air inlet on the sensor (see Figure
3-8). The recommended initial aspirator pressure setting is 6 psi. This
will vary depending on the pressure/vacuum of the process for which
the WDG-V is installed. If you purchased an AMEVision Display User
Interface, you can use the Flow Sensor output diagnostic screen to set
the flow to the ideal rate. If you do not have an AMEVision Display
User Interface, it is recommended to adjust the aspirator until you get
a response from the analyzer, then increase the pressure by 0.25 to 0.5
psi. Do not turn on the aspirator until the sensor has been turned on
and is hot (preferably 24 hours from a cold start; 1 hour after a restart).
See page 5-1 for further detail.
• The blow back pressure regulator should be set to 80 psi.
NOTE
NOTE
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...