Installation Guide | 3-1
INSTALLATION GUIDE
The operations in this chapter should be performed only by qualified
service personnel experienced in electrical safety techniques. Never
service the sensor unless power has been removed from the sensor, and
the sensor has been allowed to cool for at least one hour. Also, always
use gloves when working on the sensor.
Do not turn on the aspirator until the sensor has been turned on and
is hot - preferably 24 hours. If you turn off the analyzer or the process
is shut down, turn off the aspirator air to avoid plugging problems!
NOTE
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...