PC Configurator Software | A-13
Calibration Button
Use the Calibration Menu to configure the sensor for calibration, perform
the calibration, and view the calibration history.
TABS
OPTIONS
CALIBRATION
Set gases to calibrate. Set gas values
and timers. Perform a manual calibra-
tion now.
CALIBRATION HISTORY
Plots the history of gases calibrated.
AUTO CALIBRATION
CONFIGURATION
Set time and frequency for Auto Cal.*
CALIBRATION GAS VALUES
Set values and timers for calibration
gases to perform a manual calibration at
a later time.
*
Automatic calibration requires a factory-provided remote calibration unit (RCU)
that automatically switches the calibration gases.
All measurements require a two-point calibration: span and zero, so
the zero will always be performed.
Calibrations are only allowed when the sensor is in Normal mode.
Check the Status bar at the bottom of the Home screen if you are
unsure.
All gases selected under Sensor Configuration (O
2
, combustibles, meth-
ane) require calibration but do not have to be calibrated at the same time.
However, calibration will always occur in the same sequence.
1. O
2
Span
2. Zero
3. Combustibles Span
4. Methane Span
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...