ÄKTAexplorer Installation Guide 18-1139-59 Edition AC
5 Installation of ÄKTAexplorer
Begin by creating a clean and dry working area of 200 x 80 cm that
allows easy access. Then follow the step-by-step instructions below and
fill in the installation record as you go along, see page 30.
Note: Some components are packed in Box-900, located at the top of
the system.
Note: Some packing lists are included in the paper boxes.
5.1
Unpacking
1
After having removed the cardboard hood,
check the contents against the attached
packing list. Check also all included boxes.
Store all the enclosed paper boxes and
plastic bags in a convenient nearby place.
2
Release and remove the red strap (1)
holding the system to the pallet.
3
Lift ÄKTAexplorer onto the work area
using the four strap handles (2). Two
people are required to lift the system. Do
not raise to upright position yet. Lay the
system on the same side as on the pallet.
4
Release the two red straps with the strap
handles. Allow the straps to remain taped
to the plastic cover.
5
Pull back the plastic cover (3) to
uncover the swivel platform (4) and
raise the system to an upright
position.
6
Remove the plastic cover with the
red straps from the system.
7
Save all the original packing
material. If, for any reason, the equipment has to be repacked, for
transportation or otherwise, it is important that the system can be
safely packed using the original packing material.
1
2
4
3
18113959AC_TK.book Page 12 Monday, June 23, 2003 4:45 PM