Amerisolar Wolfram-BAT-10.24 Installation Manual Download Page 1

 

 
 
 

 

Installation Manual 

Wolfram-BAT-10.24 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Worldwide Energy and Manufacturing USA Co., Ltd.

 

Summary of Contents for Wolfram-BAT-10.24

Page 1: ...Installation Manual Wolfram BAT 10 24 Worldwide Energy and Manufacturing USA Co Ltd...

Page 2: ...ge Requirements 3 3 Product Description 3 3 1 Precautions 3 3 1 1 Identification Definition 3 3 1 2 Operational Safety 4 3 1 3 Responding to Emergencies 5 3 2 Purpose 5 3 3 Appearance 6 3 4 Structure...

Page 3: ...on Add NO 88 Qifeng Road Rugao City Jiangsu Province China Mail sales weamerisolar com 2 Packaging Transportation and Storage 2 1 Items in the Box The battery system has been rigorously tested and ins...

Page 4: ...m 1 3 Battery box 2 to breaker power line positive 500mm 25mm 1 4 Battery box 2 to breaker power line positive 500mm 25mm 1 5 Battery cabinet output power line positive 2000mm 25m m 1 6 Battery cabine...

Page 5: ...uld not exceed 80 At the same time it should be kept away from flammable and explosive materials dust and metal powder and acid or other corrosive gases The battery system should be stored in a place...

Page 6: ...gh voltage DC power supply and take good personal protective measures If you need to directly dispose of the battery please wear insulating rubber gloves 2 Keep away from children 3 Before touching th...

Page 7: ...instructions below Inhalation Evacuate the contaminated area and seek medical attention immediately Eye contact Flush eyes with running water for 15 minutes and seek medical attention immediately Ski...

Page 8: ...Worldwide Energy and Manufacturing USA Co Limited 6 3 3 Appearance Figure 1 product appearance Figure 2 product size diagram...

Page 9: ...e and lock 2 Cabinet backplane slot 10 Cabinet feet 3 Battery negative output power wiring harness Waterproof connector 11 Circuit breaker panel 4 Battery positive output power wiring harness Waterpro...

Page 10: ...e 5 product electrical parameters Technical Parameter Battery type Lithium iron phosphate LFP Rated voltage 51 2V 25 2 Rated capacity 200Ah Usable capacity 190Ah Rated energy 10 24 kWh Usable energy 9...

Page 11: ...driver Socket wrench Note Use properly insulated tools to prevent accidental electric shock or short circuit If there is no insulated tool please use electrical tape to cover the entire bare metal sur...

Page 12: ...on the back of the cabinet into the backplane and adjust the four feet to make the the cabinet land reliably Figure 6 install the cabinet Step 3 Install the first battery box Open the cabinet door pu...

Page 13: ...p 4 Install the second battery box Put the second battery box into the upper part of the cabinet as shown in the figure Use two M6 12 screws to fix the installation handle on the bottom of the battery...

Page 14: ...nction Description 1 Grounding Ground wire 2 Power button POWER Power button When switched to ON the system can be activated by the SW key or external power supply when switched to OFF the system is t...

Page 15: ...dard direct network cable connection the host is connected to PORT1 and the slave is connected to PORT0 11 Cascade terminal Link Port 1 Used for master slave cascade communication Use a standard direc...

Page 16: ...net The user only needs to install the output wiring block to the external cables of the cabinet Use M6 12 bolts to fix the cables out of the electrical cabinet through the waterproof connector from t...

Page 17: ...ing harness Step 4 Ground wire installation Use two M6 10 screws to draw the ground wire from the ground hole of the two battery boxes and connect it to the ground hole on the cabinet Figure 13 ground...

Page 18: ...connection between battery system and PCS 5 Operating 5 1 Boot Up Precaution Before starting up please make sure that the cabinet has been correctly installed and connected Boot steps Open the cabine...

Page 19: ...Troubleshooting Troubleshooting can only be performed by professionals Before checking for faults you must check whether all cable connections and circuit breakers are in the correct state Table 7 com...

Page 20: ...Worldwide Energy and Manufacturing USA Co Limited 18 SOC State of charge...