22
3. Electrical Connections
NOTE
: A wire diagram is located in the front electrical control box for connection data.
The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, and L3),
GROUND, and in the case of 4 wire service, the NEUTRAL. Providing local codes permit, power connections
to the dryer can be made by use of a flexible underwriters laboratory list cord/pigtail (wire
must conform
to ratings of the dryer), or the dryer can be hard wired directly to the service breaker. In
ALL
cases, a
strain relief
must be
used where the wire(s) enter the dryer electrical service (relay) box.
These electrical connections are made at the terminal block located in the electric service/relay box at the
rear, upper left hand corner of the dryer. To gain access into this service box, the service cover
must be
removed.
NOTE: A CIRCUIT SERVING EACH DRYER
MUST BE
PROVIDED.
Summary of Contents for MLG-130DR (HSI)
Page 45: ...ADC113130 1 03 28 00 25 ...