11
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap and/or optional shipping box) from dryer.
IMPORTANT:
Dryer
must be
transported and handled in an upright position at
ALL
times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To un-skid
the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts located
in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint door in
place.
1. Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) metal
shims (refer to the illustration) or other suitable
material under the base pads. It is suggested that
the dryer be tilted slightly to the rear.
2. If more headroom is needed when moving the dryer
into position, the top console (module) may be
removed. To remove the Top Console (module);
a. Rear of Dryer (refer to the
illustration
on
page
12
)...
1) Disconnect the four (4) pin EMERGENCY
STOP (E-Stop) Connector B .
2) Remove the Drive Motor blue wires C
marked 1, 2, 3 from the Drive Motor
Reversing Contactor T1, T2, T3.
3) Remove the Blower Motor red wires D
marked 1, 2, 3 from the Blower Motor
Overload T1, T2, T3.
4) Disconnect the two (2) pin Rotational Sensor Connector E .
b. Front of Dryer...
1) Open the Control Door
a) Remove the Phillips head screw from the bottom right of the Phase 6 Microprocessor Controller
(computer) Keyboard (touchpad) Panel Assembly.
b) Open the keyboard (touchpad) door.
2) Disconnect the four (4) pin connector.
3) Disconnect the two (2) pin connector.
Summary of Contents for MLG-130DR (HSI)
Page 45: ...ADC113130 1 03 28 00 25 ...