SECTION III
INSTALLATION PROCEDURES
Installation in a proper location
should be
performed by competent technicians in accordance with local and
state codes. In the absence of these codes, the installation
must conform
to applicable American National
Standards: National Fuel Gas Code ANSI.Z223.1-LATEST EDITION and/or National Electrical Code ANSI/
NFPA NO. 70-LATEST EDITION, or in Canada, the Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or
LATEST EDITION.
A. REASSEMBLY OF DRYER
IMPORTANT:
Always keep the tumbler (basket) section in an upright position when moving
and/or transporting.
The ML-410 dryer is shipped in two (2) pieces with the tumbler (basket) section separate from the base section.
The tumbler (basket) section will have to be lifted/hoisted onto the base section. Use cables through the eye
bolts on top of the tumbler (basket) section, or use a forklift for the lifting process.
The ML-410 tilting dryer is made with many loading and unloading options. Please refer to the reassembly
instructions on the following pages for your particular style of dryer.
If a steam dryer is shipped in two (2) pieces, the steam coil may have been removed from the top of the tumbler
(basket) section and shipped with the base section. If this is the case, carefully lift the steam coil on to the top of
the tumbler (basket) section with the steam pipe connections facing towards the right side of the dryer and bolt
the coil to the top of the dryer with the 1/4 hardware supplied. There are three (3) panels that cover the front,
right side, and rear of the steam coil. Fasten these into position also. Reconnect the steam pipe and condensate
pipe unions to the coil. These pipes run down to the flex hoses in the base section.
Summary of Contents for ML-410
Page 7: ...3 ML 410 Reference Guide ...
Page 8: ...4 ...
Page 28: ...24 MLG 410 1 Door Forward Tilt with Sprinkler ...
Page 31: ...27 MLS 410 2 Door 2 Way Tilt ...
Page 67: ...ADC 113128 1 03 13 00 25 ...