![Amazone Precea 3000-A Original Operating Manual Download Page 181](http://html1.mh-extra.com/html/amazone/precea-3000-a/precea-3000-a_original-operating-manual_2919773181.webp)
10.2 Lubricating the roller chains
IMPORTANT
Implement damage due to improper
lubrication
Grease the implement at the marked
lubrication points according to the
lubrication schedule.
Before lubrication, clean the chain with
only a penetrating oil and a brush.
Only grease the implement with the
lubricants listed in the technical data.
Do not let the lubricants drip off of the
chain.
CMS-I-00001879
10.2.1 Lubricating the roller chain on the central fertiliser metering drive
INTERVAL
After the first 10 operating hours
Every 50 operating hours
or
at the end of the season
1.
Remove the bolts
1
.
2.
Remove the cover
2
.
CMS-I-00004157
CMS-T-00007655-A.1
CMS-T-00005451-B.1
10 | Repairing the machine
Lubricating the roller chains
MG6659-EN-GB | F.1 | 25.10.2022 | © AMAZONE
175