10.1.7 Checking the levelling connection
INTERVAL
After the first 200 operating hours
Check the bolted connections
1
for tight fit.
1
111
CMS-I-00006958
10.1.8 Checking the rollers
INTERVAL
After initial operation
Every 200 operating hours
or
Every 3 months
Check the bolts
1
for tightness.
If the bolts need to be replaced,
pay attention to the alignment of the bolts.
Check the roller bearing
2
for ease of
movement.
2
2
1
1
CMS-I-00000099
CMS-T-00010184-A.1
CMS-T-00002329-C.1
10 | Repairing the implement
Maintaining the implement
MG7478-EN-GB | C.1 | 19.08.2022 | © AMAZONE
92