![Amazone Ceus 3000-TX Original Operating Manual Download Page 68](http://html1.mh-extra.com/html/amazone/ceus-3000-tx/ceus-3000-tx_original-operating-manual_2919739068.webp)
9.
Reinsert the bottom eccentric pins
1
each in the
hole
2
just below the rear rocker arm
3
. In
doing so, turn the eccentric pin so that it rests
against the rear rocker arm without play after
being inserted.
10. Secure the bottom eccentric bolt with a linch pin
4
.
11. Using the lower links, align the implement such
that the frame is parallel to the ground lengthwise.
1
2
3
4
1
3
4
CMS-I-00004851
6.3.9.2 Reducing the working depth of the coulters
1.
Raise the running gear into working position.
2.
Pull out the linch pin
3
of the bottom eccentric
pin
1
on both sides of the working depth
adjustment.
3.
Pull the bottom eccentric pin out of the hole
pattern
2
.
4.
Lower the running gear into transport position,
until the coulters have reached the desired higher
position.
1
2
3
1
2
3
CMS-I-00004852
5.
Insert the bottom eccentric pin
1
through the
hole
2
just below the rear rocker arm
4
on
both sides. In doing so, turn the eccentric pin so
that it rests against the rear rocker arm without
play after being inserted.
6.
Secure the bottom eccentric pin with the linch pin
3
on both sides.
1
2
3
4
CMS-I-00004855
CMS-T-00006915-B.1
6 | Preparing the machine
Preparing the implement for operation
MG7242-EN-GB | L.1 | 26.07.2022 | © AMAZONE
62