1.
Drive the tractor and implement onto a level
surface.
2.
Align the implement horizontally using the top
link.
6.3 Preparing the implement for operation
6.3.1 Adjusting the working depth of the coulters
6.3.1.1 Manual adjustment of the coulter working depth
1.
Lower the implement on the field.
2.
Pull the pins
2
out of the groups of holes
B
on
both sides.
3.
Slightly raise the implement.
The roller remains on the ground.
4.
Reposition the pin
1
in the desired hole of the
group of holes
A
.
5.
Secure the pin with a linch pin.
6.
Lower the implement on the field.
7.
For the coulters to be able to reach the set
working depth,
drive forwards.
8.
Insert pins
2
into the group of holes
B
on both
sides.
9.
Secure the pin with a linch pin.
A
B
1
2
CMS-I-00003088
CMS-T-00004070-I.1
CMS-T-00004071-E.1
CMS-T-00004171-D.1
6 | Preparing the machine
Preparing the implement for operation
MG6806-EN-GB | Q.1 | 26.07.2022 | © AMAZONE
47
Summary of Contents for Cenio 3000
Page 83: ......