3.9 Setting the on/off point delays
When the part-width sections are switched on
1
, it
takes a few hundred milliseconds until the application/
spreading actually starts
2
. The switch-on delay
3
can cause underlaps in working the field. When the part-
width sections are switched off, it also takes several hun-
dred milliseconds until the application/spreading actually
stops. This switch-off delay can cause overlaps in work-
ing the field.
The on/off point delays compensate for these delays
with switching the part-width sections on and off.
NOTE
The on/off point delays can only be set for AMABUS
seed drills and AMABUS sprayers.
NOTE
The
"On point delay"
must be set such that the appli-
cation/spreading starts precisely and therefore avoids
underlaps.
The
"Off point delay"
must be set such that the appli-
cation/spreading stops precisely and therefore avoids
overlaps.
Boundaries for starting and stopping the applica-
tion/spreading:
Boundary from the worked to unworked area
Field boundary
Headland boundary
If there are undesired overlaps or underlaps, the cor-
rect on/off delays can be taken from a table or deter-
mined with a formula; see page 89.
Desired overlaps or underlaps can be defined in the
"
Overlap in the direction of travel"
1
3
2
REQUIREMENTS
AMABUS implement is connected
The AMATRON 3 is started in AMABUS mode,
see page 18
AMABUS implement is selected in the implement
menu, see page 46
013608
K | Using the GPS switch| Entering the basic settings for GPS switch
MG5560-EN-II
| B.1 | 2016.07
88