
Chapter
6
32
ML-73
□□
EL
Chapter
6
Installation
■
ML-73
□
3EL, Head Unit
Refer to the following figure when installing the Head Unit.
Install the Head Unit in a well-ventilated location. Because marking may produce dust and particulates,
we recommend installing a dust collector.
Required Clearance and Mass Support:
A. Clearance on top
At least 120 mm
B. Clearance on left and right
At least 200 mm
C. Clearance in front
At least 100 mm
D. Clearance in back
At least 250 mm
E. Withstand mass
14 kg
•
Ensure the bending radius of the optical fiber at the back of Head Unit and Control Unit is at
least 150 mm.
•
When moving the Head Unit, hold the unit by the handles on top or the bottom surface to
avoid touching the protective glass. Do not hold it by the optical fiber, other cables or the
laser output part.
•
Do not disassemble or remove the Never disassemble the optical fiber and the laser output
part.
A
D
B
B
C
(Front)
(Back)
fθ lens
Bending radius:
150 mm min.
Laser output part
Optical fiber
2) Loosen the mounting
fixtures.
3) Tighten the fixtures on
the mounting board.
1) Install the fixing base (option)
on the Head Unit with the attached
M6 hexagon bolts (4 positions).
Head unit
Mounting board
(10mm thick or more)
Hexagon bolt
Fixing base
(option)
Mounting
fixtures
Summary of Contents for ML-73 EL Series
Page 1: ...Z11OM1209102 02 Fiber Laser Marker ML 73 EL OPERATION MANUAL Original instructions...
Page 4: ......
Page 133: ...Appendix...