
184
ML-3030AS/3015AS
Timing Chart
Timing Chart
An example of timing chart for the case where the LD is turned on and laser
light is output up to a monitor output is shown below . In each timing chart, the
equipment operation is represented on the axis of ordinates and the lapse of
time is represented on the axis of abscissas to show the change status based
on changes with the lapse of time at each operation and the time required for a
certain operation .
The following 5 types of timing chart are mentioned for your reference.
Single
Operation by control panel (PANEL CONTROL)
Operation by external input signals (EXTERNAL CONTROL)
2-timesharing
Operation by external input signals (EXTERNAL CONTROL)
Repeated operation (EXTERNAL CONTROL)
Repeated operation (50 pps or more) (EXTERNAL CONTROL)
⇒
For ML-30□□AS-110, Beam is selected regardless of the status of pin No.16
(beam select) of the EXT. I/O (2) connector. Therefore, the pin can be kept open.
When the CONTROL keyswitch is turned ON, the SHUTTER lamp comes on.
⇒
The control method is switched by putting pin No.25 of the EXT. I/O (1) connector
in an open circuit or a closed circuit.
For PANEL CONTROL in which control is exerted by control panel, put this pin in
an open circuit. For EXTERNAL CONTROL in which control is exerted by exter-
nal input/output signals, put this pin in a closed circuit.
⇒
For the control panel, laser light is output by pressing the LASER START/STOP
button and stopped by pressing this button once again.
For external input/output signals, laser light is output by putting pin No.2 (Laser
start) of the EXT. I/O (1) connector in a closed circuit when pin No.3 (Laser stop)
is put in a closed circuit and stopped by putting pin No.3 in an open circuit. Con-
firm that pin No.13 (Ready) is put in a closed circuit before putting pin No.2 in a
closed circuit.
Summary of Contents for ML-3015AS
Page 21: ...Introduction Part...
Page 22: ......
Page 30: ......
Page 36: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 52: ......
Page 53: ...Operating Part...
Page 54: ......
Page 163: ...Maintenance Part...
Page 164: ......
Page 175: ...Appendixes...
Page 176: ......