116
MF-C300A-SF/C500A-SF
2 . Preparations for Operations
2 . Preparations for Operations
This section explains the devices and connectors required for laser processing
by external input/output signals (EXTERNAL CONTROL) .
Connect the PLC to the EXT. I/O (1) or (2) connectors provided at the rear of the
main unit to control the main unit by executing the program from the outside.
Also, for preventing hazards, a remote interlock must be connected as a matter of
duty. The E-STOP connector (the REM. I/L connector when replacing our old prod-
ucts) is connected to the interlock of the door of the chamber or room for laser pro-
cessing. If the door is suddenly opened, the LD is turned off.
The plug, socket and case models of connectors are as follows.
Connector
Plug / Socket
Case
Manufacturer
EXT. I/O (1)
HDBB-25P(05)
HDB-CTH(10)
HIROSE ELECTRIC CO., LTD.
EXT. I/O (2)
HDCB-37P(05)
HDC-CTH(10)
REM. I/L
116-12A10-2AF10.5
TAJIMI ELECTRONICS CO., LTD.
E-STOP
HDBB-25S(05)
HDB-CTH(10)
HIROSE ELECTRIC CO., LTD.
⇒
Prepare a program and its development environment for laser control on the cus-
tomer side.
⇒
It is recommended to use the shielded cable for inputting and outputting the con-
trol signal.
⇒
To exhibit the shield effect, it is recommended to connect the shield of a cable to
the shield of a connector case or FG (flame ground), but it may be better not to
connect to a ground in some cases. Perform evaluation and connection to match
the operation of the overall system.
⇒
When there is influence of noise, attach a ferrite core as close to the equipment
as possible. A ferrite core has an effect in reducing external noise.
Rear of the main unit
EXT. I/O (1) D-Sub 25pin Connector
EXT. I/O (2) D-Sub 37pin Connector
Control signal input/output
Control signal input/output
PLC, etc.
Door interlock, etc.
REM. I/L Connector
E-STOP D-Sub 25pin Connector
Summary of Contents for MF-C300A-SF
Page 20: ......
Page 21: ...Introduction Part...
Page 22: ......
Page 36: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 42: ......
Page 50: ......
Page 51: ...Operating Part...
Page 52: ......
Page 114: ......
Page 159: ...Maintenance Part...
Page 160: ......
Page 176: ......
Page 177: ...Appendixes...
Page 178: ......