
56
MF-C2000A Series
3 . Connecting the Hose for Cooling Water
Preparing the Cooling Water
This section explains how to supply the cooling water .
Item required
Cooling water (10 liters) and water feed pump
CAUTION
Use our specified cooling water . Tap water, industrial water, or ground water may
cause corrosion or clogging, resulting in fault of the equipment .
⇒
When the chiller is operated for the first time after water feeding, the water level
lowers. If it is lower than the lower limit, replenish cooling water again.
⇒
Be sure to confirm that the feed-water inlet filter is installed before supply the wa
-
ter. Otherwise, the pump may fail due to contamination of foreign substances.
Remove the cap and confirm that the feed-water inlet
filter is installed before supplying water.
Feed-water inlet filter
Chiller
Summary of Contents for MF-C2000A Series
Page 1: ...AA04OM1209213 07 FIBER LASER WELDER MF C2000A Series OPERATION MANUAL ...
Page 21: ...Introduction Part ...
Page 22: ......
Page 34: ......
Page 42: ......
Page 43: ...Installation and Preparation Part ...
Page 44: ......
Page 73: ...Operating Part ...
Page 74: ......
Page 78: ......
Page 142: ......
Page 212: ......
Page 213: ...Maintenance Part ...
Page 214: ......
Page 232: ......
Page 244: ......
Page 245: ...Appendixes ...
Page 246: ......