Chapter
2 - Installation
2.2
Installing the CPE-IDU-1D Indoor Unit
2.2.1 Installation
Requirements
2.2.1.1 Packing
List
BMAX-CPE-IDU-1D
Wall mounting kit
Mains power cord
2.2.1.2
Additional Installation Requirements
Ethernet cable(s): a crossed cable if connecting to a hub/switch and a
straight cable if connecting directly to a PC Network Interface Card (NIC).
NOTE
The length of the Ethernet cable connecting CPE-IDU-1D to the user’s equipment, together with the
length of the IDU-ODU cable, should not exceed 100 meters.
Mains plug adapter or termination plug (if the power plug on the supplied AC
power cord does not fit local power outlets).
Portable PC with an Ethernet card and a straight Ethernet cable for
configuring parameters using Telnet. TFTP server SW is required for
downloading SW versions.
Other installation tools and materials (a drill for wall-mounting the unit,
means for securing cables to walls, etc.)
BreezeMAX PRO CPE
18
Summary of Contents for BreezeMAX PRO CPE
Page 1: ...BreezeMAX BreezeMAX PRO CPE Manual S W Version 1 0 2 September 2005 P N 214094 ...
Page 2: ......
Page 8: ......
Page 10: ......
Page 14: ......
Page 16: ......
Page 38: ......
Page 46: ......
Page 73: ...A A Appendix A Preparing the SU IDU ODU Cable ...