Chapter 3 - Commissioning
Commissioning Steps
BreezeMAX PRO 5000 CPE
31
Product Manual
3.1
Commissioning Steps
After completing the installation process, as described in the preceding chapter,
several actions should be performed to ensure connectivity with a BTS and
provisioning of services. After the CPE is connected with a BTS, it can be fully
managed via the wireless link:
1
The basic parameters must be configured to ensure that the unit operates
correctly and can communicate with a BTS.
2
The antenna must be aligned to ensure optimal performance of the wireless
link.
3
Proper operation should be verified, including data connectivity.
Summary of Contents for BreezeMAX PRO 5000 CPE
Page 1: ...BreezeMAX PRO 5000 CPE Product Manual Software Version 1 5 April 2010 P N 215643...
Page 17: ...Tables BreezeMAX PRO 5000 CPE xvii Product Manual Table 4 3 CPE Parameters Summary 85...
Page 18: ...1 Chapter Product Description...
Page 27: ...2 Chapter Installation...
Page 46: ...3 Chapter Commissioning...
Page 58: ...4 Chapter Operation...
Page 105: ...A Appendix Troubleshooting...
Page 109: ...Glossary...