Verifying Proper Operation
Manual Revision 1.0
C-3
When installed on a wall, the Interface Unit must be installed with the
bottom panel, which includes the connectors, facing downwa
t
The Interface
ll using 4 screws or to
a concrete wa
bolts.
If the unit is
d must be
installed to pr
ts are firmly
secured, plac
ed between the
unit and th
Figure C-3: Interface Unit with Sun Guard
rd.
Figure C-2: Wall Mounting the Interface Uni
Unit can be secured to a wooden wa
ll using 4 masonry anchors and suitable
exposed to direct sunlight, the Sun Guar
event overheating. Before the screws or bol
e the Sun Guard so that it is properly secur
e wall.
Summary of Contents for BreezeACCESS II CX
Page 1: ...Cell Extender System Manual August 2004 P N 213837...
Page 2: ...Error No text of specified style in document Cell Extender System Manual ii...
Page 10: ......
Page 12: ......
Page 16: ...Figures Cell Extender System Manual ii...
Page 30: ...Chapter 1 System Description Cell Extender System Manual 1 12...
Page 69: ...A A Appendix A Wiring10 100Base T Jacks...
Page 71: ...B B Appendix B Preparing the Indoor to Outdoor Ethernet Cable...
Page 74: ...Appendix B Preparing the Indoor to Outdoor Ethernet Cable Cell Extender System Manual B 4...