TAS12-EDM & TAS12P-EDM Installation Instructions
PUD4005R1-0
For Assistance: [email protected] +1 (909) 591-8431
Page 15
Power On
1. Power on the turnstile by pushing the recessed
power button on the arm side of the turnstile cabinet
using the eraser end of a pencil (or similar shaped
object). The location of the power button will differ
depending on if the turnstile is a right-hand or left-
hand unit [Figure 13].
2.
Depending on how the turnstile is configured for
network communication, the turnstile boot up routine
will take approximately 15 seconds to 1 minute.
During boot up:
•
The attendant notification lights will flash red
while establishing communication with the
GateLink 10 server [Figure 14.
• The arms will undergo test rotations.
• At the end of the boot up routine, the arms
will rest in the home position, and the TAS12
screen will display a message instructing the
guest to scan a ticket.
If the red attendant notification light continues to flash
after boot up, communication has not been established
with the GateLink 10 server. Refer to the Troubleshooting
section on page 23 and notify your network administrator.
Attendant
Notification
Lights
ON/OFF Button
In Right-Hand
Turnstiles
In Left-Hand
Turnstiles
NOTE
Fig. 13
Fig. 14