TAS12-EDM & TAS12P-EDM Installation Instructions
Page 14
For Assistance: [email protected] +1 (909) 591-8431 PUD4005R1-0
Post-Installation Inspection
Perform this post-installation inspection BEFORE powering on the turnstile for the first time.
1.
Anchoring (fixed installations only): Verify the anchor bolts are tensioned to 20 ft-lbs. Tighten if necessary.
2. TAS12: Verify the TAS12 mounting screws are tightened. Tighten if necessary.
3. Dust, Dirt, & Debris: While the unit is powered down, open the lid to reveal the interior electronics. Blow any dirt,
dust, and small debris out of the turnstile with low-pressure compressed air such as Dust-Off.
4. Wiring: Inspect all wires and contacts for exposure to any metal parts that may lead to a short.
Perform the following checks to verify the turnstile is performing properly. Function checks are included for optional
peripherals (i.e. RFID, mag stripe reader, printer) and may not be applicable to your installation. If any problems are
encountered, please refer to the Troubleshooting section on page 23.
The following is assumed:
•
The GateLink10 server is online and configured for use.
• The network is up and running.
• Thermal printer is loaded with paper (TAS12P-EDM models only).
•
Sample credentials (i.e. barcode tickets, magnetic stripe cards, etc.) are available and have been configured
as valid credentials in the GateLink10 application.
• The turnstile passed the Post-Installation Inspection.
WHEN THE TURNSTILE IS POWERED ON, THE ARMS ROTATE FOR THE DURATION OF THE BOOT
UP PROCESS. BEFORE POWERING ON, PLEASE MAKE SURE THE AREA IS CLEAR OF PERSONS OR
PROPERTY.
Post-Installation Functions Check
NOTE
CAUTION