MST Installation Instructions
Installation Instructions [email protected] +1(909) 591-8431 www.alvaradomfg.com
Page 11
Fig. 16
Bottom
Bearing
Bottom
Bearing Plate
Fig. 17
Yoke
Roto
OV
CL
Roto Installation (Cont)
2.
Apply grease, as instructed in the roto Installation note on the previous page. Lower the roto, bottom bearing
first, into the bottom bearing plate (Figure 16). Wipe away any excess grease.
3.
When complete, refer to Figure 17 for correct orientation.
Top Channel Installation
A minimum of two people is required to
complete the installation of top channel.
1.
Remove the cover from the top channel using a
⅛" Allen wrench (Figure 18).
2.
Determine orientation before installing the top
channel.
NOTE
The end of the top channel with the power outlet
attached to it must be mounted over the yoke.
The end of the top channel with the large hole in
the center and two smaller holes on either side
must be mounted over the OV.
Fig. 18
⅛" Allen
Wrench
Allen Head Screw
Top Channel
Grease