P
O
P
MOUNTING THE ROOF HOOKS
Please note:
-
The
gap between the edge
of the plate head screw and the end of the
rafter must be at
least 24mm
.
-
The plate head screw must be inserted to a
depth of at least 60mm
.
-
Ideally recommended for roofs with rafters at least 80mm across, and
at
least 60mm
.
-
It is necessary to pre-drill holes into the wooden substructure when
using wood screws.
-
We recommend that roofing tasks should only be carried out by pro-
fessional roof contractors.
Ensure the
ground plate
of the hook is fully connected to the rafter. Uneven
areas can be compensated for with a variety of extra underlay plates.
Use additional rafters or purlins to ensure the
ground plate
of the roof
hook is in full contact.
Replace the previously-removed roof tile correctly. If required, remove
part of the lip of the tile an angle grinder. Make sure the roof remains
Where there is insulation between the rafters and the tiles, it is necessary
to use
2 ‘wood screws with fixing threads’
to attach the hooks to the raf-
ters. The wood screws must be anchored at
least 60mm
into the rafters.
The wood screws with a fixing thread must be provided at the site.
9
Summary of Contents for AS 2.1
Page 1: ...TILED ROOFS AS 2 1 EN SOLAR INSTALLATION INSTRUCTIONS 1 ...
Page 6: ...MOUNTING WITH ROOF HOOKS VERTICAL MODULE ARRANGEMENT SINGLE DIRECTION 6 ...
Page 14: ...MOUNTING TRUSS PROFILES IN A LATTICE ARRANGEMENT HORIZONTAL MODULE ARRANGEMENT 14 ...
Page 18: ...MOUNTING WITH AL13 X ROOF HOOKS VERTICAL MODULE ARRANGEMENT LATTICE 18 ...