
Chapter 7. System Management
165
10. When you have completed your schedule choices, click
Next
.
The procedure completes and you return to the
Tasks
main page. The
Export Event Log task, configured according to the choices you made, is
now added to the Sidebar and the Task List:
Power Control a Device
This task allows you to set a time schedule that automates turning power ports
on and off for the selected device as a whole, or on a port-by-port basis. When
you choose this task, the Power Control page appears, with the
Target Device
category selected:
If you prefer to perform the task on a port-by-port basis, select the
Outlets
category, instead.
1. Provide a name for the task.
2. Put a check in front of the target devices or ports you want to control, or
put a check at the top of the column to select all of them.
3. Select whether to turn the ports On or Off in the
Operation
column.
4. When you have finished with this page, click
Next
(at the top-right of the
panel), to move on.
cc2k.book Page 165 Tuesday, December 21, 2010 4:00 PM