![Altos P10 F6 User Manual Download Page 11](http://html1.mh-extra.com/html/altos/p10-f6/p10-f6_user-manual_2912773011.webp)
7
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
•
Near a grounded power outlet.
•
Clean and dust-free.
•
Stable surface free from vibration.
•
Well-ventilated and away from sources of heat.
•
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•
System unit
•
Accessory box
If any of the above items is damaged or missing, contact your
dealer immediately.
Save the boxes and packing materials for future use.