
1
INTRODUCTION
The purpose of this manual is to assist you in
the installation, operation and maintenance of
your new boiler in order to achieve the best
performance possible. We recommend that the
unit be installed by an authorized Alternate
Heating Systems, LLC. dealer or by an
experienced boiler installation technician who
has a thorough knowledge of hydronic heating
systems and boilers. Should your installation
require a steam boiler, it is even more
important that experienced personnel be
consulted to ensure that the necessary safety
controls are installed and properly wired.
Read the entire instruction manual carefully
and understand it thoroughly before installing
or operating this unit. SAVE THESE
INSTRUCTIONS and review them periodically
to refresh your memory regarding safe
operating practices and routine maintenance
required.
All Alternate Heating Systems, LLC. boilers
can be supplied with the ASME “H” stamp and
National Board number for an additional fee
when requested prior to purchase. Alternate
Heating Systems boilers are built to rigid
quality control standards. You can be assured
of receiving a high quality product.
Summary of Contents for COAL GUN S1000
Page 2: ......
Page 4: ......
Page 7: ......
Page 8: ......
Page 29: ...21 the boiler should immediately be taken out of service and thoroughly cleaned ...
Page 30: ...22 APPENDIX A BOILER SPECIFICATION DIAGRAMS ...
Page 31: ...23 ...
Page 32: ...24 ...
Page 33: ...25 ...
Page 35: ...27 APPENDIX B WIRING DIAGRAMS ...
Page 36: ...28 ...
Page 37: ...29 ...
Page 38: ...30 ...
Page 39: ...31 ...
Page 40: ...32 APPENDIX C EXPLODED PARTS DRAWING ...
Page 42: ...34 ...
Page 54: ...46 APPENDIX H DUMP ZONE WIRING APPLICATIONS ...
Page 55: ...47 ...
Page 56: ...48 ...
Page 57: ...49 ...
Page 58: ...50 APPENDIX I BOILER PIPING EXAMPLES ...
Page 62: ...54 IMPORTANT READ AND KEEP IN YOUR POSSESSION ...