RPV311
Chapter 4
– Configuration
RPV311-TM-EN-6
85
9
THRESHOLDS
Measured values are continuously monitored and may be tested once every cycle of the nominal frequency
of the system, against lower and upper thresholds and range rates involving:
Magnitude;
Frequency;
Active, Reactive, and Apparent Powers;
Positive and Negative Sequences;
Imbalance;
Digital Signals.
Variation (d/dt)¹
GOOSE Signals
¹ The variation thresholds are calculated with1 cycle time window
The results of all thresholds are processed using user-definable Boolean equations and can be used to
trigger the recording of fault, traveling waves, and disturbance data.
The thresholds can be associated with power, voltage and current circuits, digital channels or DC channels,
as follows:
Voltage and Current: upper and lower limits, and rate of change:
o
ABC
- RMS value;
o
N
- neutral RMS value;
o
ABC1
- RMS value of fundamental component;
o
N1
- RMS value of neutral fundamental component;
o
𝐹
- frequency;
o
𝑆
+
- positive sequence;
o
S
−
- negative sequence;
o
𝑈
- imbalance;
o
THD
- total harmonic distortion.
o
VOSC
- voltage oscillation;
o
FRQOSC
- frequency oscillation (measured from voltage);
Power: upper and lower limits, and rate of change:
o
S
- combined apparent power;
o
S
1
- fundamental apparent power;
o
P
1
- fundamental active power;
o
Q
1
- fundamental reactive power.
Power: upper limits:
o
S𝑂𝑆𝐶
- power swing.
Summary of Contents for Reason RPV311
Page 2: ......
Page 15: ...INTRODUCTION CHAPTER 1...
Page 34: ...SAFETY INFORMATION CHAPTER 2...
Page 45: ...HARDWARE DESIGN CHAPTER 3...
Page 56: ......
Page 57: ...CONFIGURATION CHAPTER 4...
Page 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Page 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Page 117: ...OPERATION CHAPTER 5...
Page 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Page 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Page 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Page 155: ...RECORDS CHAPTER 6...
Page 172: ......
Page 173: ...TW FAULT LOCATOR CHAPTER 7...
Page 183: ...PMU CHAPTER 8...
Page 189: ...MODBUS CHAPTER 9...
Page 193: ...DNP3 CHAPTER 10...
Page 196: ......
Page 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Page 200: ......
Page 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Page 228: ......
Page 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Page 249: ...COMMUNICATIONS CHAPTER 14...
Page 261: ...INSTALLATION CHAPTER 15...
Page 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Page 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Page 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Page 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Page 340: ...APPENDIX A...