To improve the accuracy of the measurement, a correction factor can be manually provided. Inputs without
the correction factor have accuracy better than 1%.
The digital channels do not have type selection.
Figure 13: Analog inputs configuration section
A
The P
OSITION
indicates the position of each analog input on the back panel of the module.
B
The I
NPUT
scroll box allows user to select the type of the signal to be measured (AC voltage 115 V, AC
current 1 A, AC current 5 A, DC current 0-20 mA or DC voltage ±10 V).
C
The A
DJUSTMENT
text field allows user to enter a correction factor to adjust the accuracy of the
measurement.
3.5
ACQUISITION WITH SAMPLED VALUES
The RPV311 data acquisition can be performed by Sampled Values data, incoming of Merging Units. The
acquisition is done by connecting the Process Bus Ethernet port to the Sampled Values generator.
If the acquisition is done by Sampled Values, there is no physical link to configure. The configuration is
performed by Subscription links. Each subscription link contains data of 4 current (Phases A, B, C and
Neutral) and 4 voltage (Phases A, B, C and Neutral) circuits.
Once a subscription link is created, the RPV311 automatically configures the first channels as current and
the last as voltage, as shown in Figure 86. This is done because the Merging Units send the Sampled Values
package according to the IEC 61850-9-2LE.
Summary of Contents for Reason RPV311
Page 2: ......
Page 15: ...INTRODUCTION CHAPTER 1...
Page 34: ...SAFETY INFORMATION CHAPTER 2...
Page 45: ...HARDWARE DESIGN CHAPTER 3...
Page 56: ......
Page 57: ...CONFIGURATION CHAPTER 4...
Page 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Page 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Page 117: ...OPERATION CHAPTER 5...
Page 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Page 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Page 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Page 155: ...RECORDS CHAPTER 6...
Page 172: ......
Page 173: ...TW FAULT LOCATOR CHAPTER 7...
Page 183: ...PMU CHAPTER 8...
Page 189: ...MODBUS CHAPTER 9...
Page 193: ...DNP3 CHAPTER 10...
Page 196: ......
Page 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Page 200: ......
Page 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Page 228: ......
Page 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Page 249: ...COMMUNICATIONS CHAPTER 14...
Page 261: ...INSTALLATION CHAPTER 15...
Page 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Page 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Page 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Page 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Page 340: ...APPENDIX A...