13
2 Installation
Alpha Technologies
2.2
Installing the Unit
2.2.1: CFR 5000
The seismic brackets can be removed if they are not required by the local code or
you are not in an earthquake zone (See
Tools and Materials Required:
•
Fork lift or other means of transporting heavy objects (up to 381 lbs./173kg).
•
Screwdriver or power screwdriver with a Philips bit.
•
5
/
8
inch socket wrench.
Procedure:
1
The unit is shipped attached to a pallet. Use a forklift or pallet jack to transport the unit and
pallet to the installation site.
2
Remove the packing from around the unit. Unbolt the unit from the pallet.
CFR 5000
attached to
pallet with 5/8
inch bolts.
3
Slide the unit off the pallet as per the included instruction sheet (017–098–C3). Move the
unit to its final position.
4
If the seismic brackets are used, mark the position on the floor where the unit will be se-
cured by using the bracket as a template. Drill holes and secure using the appropriate
anchor bolts.