background image

INSTALLATIONMANUAL

ENERGYSTORAGESYSTEM(ESS)

STORION-SMILE-T10(INDOOR)

INSTALLATION & OPERATION MANU-AL

EV CHARGER

SMILE-EVCT11

V01

Alpha ESS Co., Ltd.

      

+86 513 806 068 91

      [email protected]
      www.alpha-ess.com
      JiuHua Road 888, High-Tech Industrial Development
      Zone 226300 Nantong City, Jiangsu Province
 

Alpha ESS Suzhou Co., Ltd.

      

+86 512 6828 7609

      [email protected]
      www.alpha-ess.com
      Building 10-A, Canal Town Industrial Park, 99 Taihu E Rd, 
      Wuzhong District, Suzhou  215000

Alpha ESS Europe GmbH

      +

49 610 3459 1601

      [email protected]
      www.alpha-ess.de
      Paul-Ehrlich-Straße 1a 63225 Langen

Alpha ESS Australia Pty. Ltd.

     

+61 1300 968 933

      [email protected]
      www.alpha-ess.com.au
      Unit 1, 2 Ralph Street Alexandria NSW 2015

Alpha ESS Italy S.r.l.

      +39 599 239 50
      [email protected]
      www.alpha-ess.it
      Via Loda,17-41013 Castelfranco Emilia(MO)

Alpha ESS Korea Co., Ltd

      +82 64 721 2004 
      [email protected] 
      2F, 19-4, Nohyeong 11-gil, Jeju-si, Jeju-do, 
      Republic of Korea

Alpha ESS UK Co., Ltd

      [email protected] 
      Drake House, Long Street, Dursley, gl11 4hh

@AlphaESS

@AlphaEnergyStorageSystem

@AlphaESS

@alpha_ess

Summary of Contents for SMILE-EVCT11

Page 1: ...ong District Suzhou 215000 Alpha ESS Europe GmbH 49 610 3459 1601 europe alpha ess de www alpha ess de Paul Ehrlich Straße 1a 63225 Langen Alpha ESS Australia Pty Ltd 61 1300 968 933 australia alpha ess com www alpha ess com au Unit 1 2 Ralph Street Alexandria NSW 2015 Alpha ESS Italy S r l 39 599 239 50 info alpha ess it www alpha ess it Via Loda 17 41013 Castelfranco Emilia MO Alpha ESS Korea Co...

Page 2: ... Area 3 4 AC Wiring 3 5 Communication Connection 14 15 4 1 Configuration 4 2 Setup on AlphaCloud and APP 19 20 5 1 Indicator State 5 2 Fault Code 22 SPECIFICATION PARAMETER 06 2 1 Package Verification 2 2 Installation Preparation 2 3 AC Charger Mounting This manual is under the copyright of Alpha ESS Co Ltd with all rights reserved Please keep the manual properly and operate in strict accordance w...

Page 3: ... AlphaESS does not assume any direct or indirect liability Product modified design changed or parts replaced without AlphaESS authorization Changes or attempted repairs and erasing of series number or seals by Unauthorized AlphaESS technician System design and installation are not in compliance with standards and regulations Failure to comply with the local safety regulations Transport damage incl...

Page 4: ...here is quantity in short or type inconformity make the record in time and contact the seller at once 03 04 Multimeter Electric drill Tight the screws Tight the bolts Hole on the wall Cut cables Diagonal Pliers Cross Screwdriver PH2x150mm PH3x250mm Insulated Torque Wrench Tool Name Photo Function 180mm Check electrical connection and electri cal parameter Power supply cable 5 6mm three phase power...

Page 5: ...he AC Charger are listed below 1 According to the cases of the attached installation board drill 3 x Φ 6 35 mm holes on the wall and insert the expansion pipe 2 Lock the 2 x M4 32mm self tapping screw into the expansion pipe and reserve 5mm space 3 Open the top cover of EV charger hang it on the 2x M4 32 mm self tapping screws lock it into the bottom M4 32 mm self tapping screw and then cover the ...

Page 6: ...void the hazards involved 3 2 System Wiring Diagram 3 3 1 AC Charger Appearance 3 3 Overview of the Connection Area 3 1 Installation Notice LOADS Alpha Cloud PV PANELS EV Charger GRID ESS Sytem LOADS Alpha Cloud PV Panels EV Charger Grid ESS System RS485 RS485 BB Communication Connection Reminder Light Front side view Front Panel Display Note the EV charger should be installed between the grid met...

Page 7: ...in the figure below 3 The wiring is shown in the figure below 3 5 1 Communication Connection between SMILE5 INV INDOOR and AC Charger 40mm Yellow Green Blue Gray Black Brown Yellow Green Blue Gray Black Brown 8mm 15mm 09 10 ESS SMILE5 INV SMILE B3 SMILE HV Series RJ45 RS485 PIN4 RS485 B PIN5 RS485 A RJ45 RS485 PIN4 RS485 B PIN6 RS485 A ESS SMILE T10 INV Storion T30 RS485 RJ45 PIN4 PIN5 EV AC Charg...

Page 8: ...nication Cable Self made Storion T30 3 5 5 Communication Connection between Storion T30 and AC Charger 3 5 4 Communication Connection between SMILE T10 and AC Charger Communication Cable Self made Communication Cable Self made Communication Cable Self made SMILE T10 AC Charger SMILE5 INV OUTDOOR RS485 PIN RS485 PIN 4 5 AC Charger RS485 PIN 4 5 4 5 SMILE5 B3 RS485 PIN 4 5 4 5 3 6 AC Charger SMILE T...

Page 9: ...ouse ELECTRICAL CONNECTION System Configuration and Operation 04 Note The EV charger can also be used without being combined with the energy storage system To do this swipe the RFID card on the EV charger and the charging process begins automatically However in this case only the Max Power Charge mode is available see Fig 4 2 1 4 on page 17 13 14 SMILE HV Series 3 5 6 Communication Connection betw...

Page 10: ...ll feed into the grid Max EV charging power P_EVmax P_pv P_load P_bat 4 2 1 2 Green Charge General Charge 4 2 1 Charging Mode Instruction 4 2 1 1 Green Charge Slow Charge ESS EV Charger PV Panels AC DC DC Grid Loads 1 PV supply Priority 1 Other Loads 2 Batteries of ESS 3 EV charger 4 Feed in I 2 A 3 4 EV source Priority A PV Battery supply Priority 1 Other Loads Max power adjustable Max power adju...

Page 11: ...Priority I EV Charger II Other Loads The EV charging source is PV and batteries If PV power is available it will supply other loads firstly then supply the EV charger and maximize the EV charging power and then charge the batteries of the ESS At last it will feed into the grid The battery will be used for other loads and then for EV charger Max EV charging power P_EVmax P_pv P_load P_bat 4 2 1 4 M...

Page 12: ...rrent Reverse connection Charging cable connection abnormal AC input voltage may be too high AC input voltage may be too low AC output current may be too large AC input frequency may be too high AC input frequency may be too low Temperature may be too low inside the charger Leakage current to the earth may be too high Reverse connection of L N in put cable Poor connection of charging cable with EV...

Page 13: ...rent Rated Power 400 V 16 A 11000 W Output Protection RCD IP Degree 6 mA DC IP65 Input Interface Communication If the above problems cannot be solved please contact the seller NOTE 21 22 Error Code Problems Solutions Possible Causes Charging pile No 1 lose Communication cable connection abnormal Poor connec tion of charging cable with EV Charger 1 Check if Communication cable connection is correct...

Reviews: