6
Install filler strip to Wall Section F
12. Position WALL SECTION G
Position Wall Section G on the left front side of
the sauna according to the guide on ILLUSTRA-
TION 1.
NOTE:
Wall Section G will not attach to Wall
Section A.
Position Wall Section G
13. Position WALL SECTION H
Position Wall Section H on the front left side of
the sauna according to the guide on ILLUSTRA-
TION 1. Using 2” screws and pre-drilled holes,
fasten Wall Section H to Wall Section G.
NOTE:
Wall Section H will not attach to the filler
strip previously attached to Wall Section F.
Position Wall Section H
14. Attach WALL CONNECTOR
Find the pre-drilled wall connector. Place the
wall connector on the top of the front wall edge,
bridging walls H, the filler strip, and wall F.
Screw it into place with 2” screws.
Attach wall connector
11. Install FILLER STRIP
Screw the filler strip to Wall Section F to fill the
gap between Wall Sections F and H. Optional
trim pieces will later be installed over this joint.
NOTE:
Due to the inherent variations in lumber
dimensions, this gap may not be completely filled
by the filler piece. This will be addressed later.
H