
PAGE 214
ALMAC s.r.l.
Type of inspection
Description
Damage to tubes and cables
Date
Observations
Signature
1st year
2nd year
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
NOTE: Frequency of the operation as reported in the table in Chapter 6. Monthly registration
is not necessary, but should be made at least once a year when other operations are
performed.
Type of inspection
Description
Greasing the runners
Date
Observations
Signature
1st year
2nd year
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
NOTE: frequency of the operation as indicated in the table in Chapter 6. Monthly registration
is not necessary, but should be made at least once a year when other operations are
performed.
Summary of Contents for AlmaCrawler JIBBI 1250 EVO
Page 40: ...PAGE 40 ALMAC s r l 1 2 3 1 2 3 ...
Page 47: ...PAGE 47 ALMAC s r l ...
Page 74: ...PAGE 74 ALMAC s r l ...
Page 77: ...PAGE 77 ALMAC s r l 3 3 2 Radio mobile control push button panel if present ...
Page 80: ...PAGE 80 ALMAC s r l 3 3 3 Push button panel display cable version and radio version ...
Page 210: ...PAGE 210 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Page 212: ...PAGE 212 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Stamp and signature ...
Page 228: ...PAGE 228 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...