background image

 

 

 

 

ALL168205 NANO Quick Installation      © 2012 ALLNET GmbH    All rights reserved          Page 2                                             

 

P

REFACE

 

This document describes installation of the 200Mbps PLC Ethernet Bridge Network products. 

Please read this document before installing the product. 

 

T

O THE 

I

NSTALLER

 

This publication contains the following sections: 

 

Important safety instructions 

 

The first thing you need to know before you begin to install 

 

Product installation guide 

 

Specification 

Summary of Contents for ALL168205NANO

Page 1: ... 2012 All rights reserved by ALLNET GmbH Page 1 QUICK INSTALLATION GUIDE For ALL168205NANO 200Mbps PLC ETHERNET BRIDGE ...

Page 2: ...tallation of the 200Mbps PLC Ethernet Bridge Network products Please read this document before installing the product TO THE INSTALLER This publication contains the following sections Important safety instructions The first thing you need to know before you begin to install Product installation guide Specification ...

Page 3: ...ctors DO NOT allow anything to rest on the product interconnect cords DO NOT locate this product where people may walk on the cords Because the 200Mbps PLC Ethernet Bridge product sends data over the powerline it is recommended that you plug it directly into a power outlet Do not plug the device into a UPS or power strip with surge protection The 200Mbps PLC Ethernet Bridge product has its own pow...

Page 4: ...ents except for Microsoft Network Client for Netware Networks or Microsoft Family Logon are installed No network services except file and printer sharing for Microsoft Networks or Personal Web Server are installed No network protocols except Microsoft s TCP IP IPX SPX NetBEUI or Net BIOS support for IPX SPX are installed 3 Network installation requires two steps 1 Install the 200Mbps PLC Ethernet ...

Page 5: ...l be limited at 200 meter and for in house use only More than 200 meter will cause signal reduction or data loss The devices have to be operated on the same power phase in the building If using different power phases performance may be degraded or the connection may fail In this case it might be necessary to install a powerline phase coupler If you have any problems during installation or operatio...

Page 6: ...on is established and starts blinking when data communication proceeds on Powerline The color of this LED shows the quality of the PLC link Green indicates a good connection speed orange is medium speed and red signals low connection speed The more exact speed values can be shown by the configuration utility 6 The ETH LED indicator is lit when the adapter has a working ethernet link and starts bli...

Page 7: ...t Plug the provided Ethernet cable into the RJ45 connector of the Bridge and plug the other end of the cable into an available Ethernet port of the broadband router 2 Connect the other Ethernet Bridge to the wireless AP Plug the Ethernet Bridge into an AC outlet Plug the provided Ethernet cable into the RJ45 connector of the Bridge and plug the other end of the cable into the Ethernet port of the ...

Page 8: ...16 64 256 1024 QPSK BPSK ROBO Standards IEEE 802 3az Ethernetphy HomePlug AV specification and IEEE1901 standard Co existence with Homeplug 1 0 Operating System Microsoft Windows 2000 XP Vista Windows 7 for utility program only Nodes Up to 8 total PLC devices IGMP IGMP Supports IGMP managed multicast sessions Encryption 128 bit AES Link Encryption with key management Push button NID RST button Por...

Page 9: ...nge The Powerline connection quality is fair Red The Powerline connection quality is bad Off No Powerline Link detected ETH Green On Ethernet Link detected Blinking Ethernet traffic detected Off No Ethernet Link detected 1 The PWR LED indicator will blink in standby mode It will automatically get into standby mode if the Ethernet link is lost for 60 seconds If you unplug the Ethernet cable it will...

Page 10: ... The PWR LED starts to blink Hint Please use an adapter that is plugged in close to the new adapter so you can observe the LEDs of both adapters at the same time Step 3 The new device starts to communicate with the device from existing private network and tries to join this existing private network After this process is finished ca 10sec the PWR LED will stop blinking and both adapters are perfomi...

Page 11: ...04 A1 2010 IEC 61000 4 5 2005 IEC 61000 4 6 2008 IEC 61000 4 8 2009 IEC 61000 4 11 2004 EN 60950 1 2006 A11 2009 A1 2010 A12 2011 This equipment is intended to be operated in all countries This device has been tested and found to comply with the stated standard s which is are required by the Council Directive of 2004 108 EC and Low Voltage Directive of 2006 95 EC The test results are indicated in ...

Reviews: