Chapter 5
Powering On the Switch
This chapter contains the following procedures:
“Connecting the Grounding Wire” on page 96
“Wiring the ALM IN and ALM OUT Connectors” on page 99
“Preparing the DC Power Cables” on page 104
“Powering On the Switch” on page 108
“Monitoring the Initialization Process” on page 110
“Starting a Local Management Session” on page 113