IE048-480 Power Supply Installation Guide
39
Installation Worksheets
This section has the two worksheets for planning the installation and
record-keeping.
Installation worksheet 1 - Table 8 on page 40: Use this worksheet
to record the location of the power supply along with the voltages
of the AC input and DC output connectors. The worksheet also has
an entry for the manufacturer and model name of the equipment
enclosure, which is required for outdoor and some indoor
installations.
Installation worksheet 2 - Table 9 on page 41: Use this worksheet
to record the basics of the powered devices connected to the
power supply. This includes the products’ model names, whether
they are PoE source devices, and their power consumption values.
The power consumption of a non-PoE source device is provided in
its installation guide. The power consumption of a PoE source
device requires knowing the consumption values of the source
device as well as the powered devices, and summing the values.
Copy the worksheet as many time as needed to record all the
powered devices.
Summary of Contents for IE048-480
Page 1: ...613 002833 Rev A IE048 480 Industrial AC DC Power Supply Installation Guide...
Page 6: ...6 I PDF Allied Telesis alliedtelesis com library...
Page 8: ...Contents 8...
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 42: ...Chapter 2 Beginning the Installation 42...
Page 51: ...IE048 480 Power Supply Installation Guide 51 Figure 12 Installing the Ground Wire...
Page 53: ...IE048 480 Power Supply Installation Guide 53 Figure 13 Installing the AC Power Wires...