CentreCOM GS970EMX Series Installation Guide for Standalone Switches
81
Figure 45. Marking the Screw Holes for Four BRKT-J23 Brackets
5. Place the switch and brackets on a table.
6. For a wooden wall, use a stud-finder to determine if there are any live
electrical wires at the screw hole locations.
7. If required, pre-drill the screw holes on the wall. For a concrete wall,
observe the following:
Set the drill to hammer and rotation mode to break up the concrete
and clean out the hole.
Clean out the holes with a brush or compressed air.
8. If required, install wall anchors.
9. Attach the bottom BRKT-J23 brackets to the wall with appropriate
screws. Refer to Figure 46 on page 82.
Summary of Contents for CentreCOM GS970EMX Series
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 56: ...Chapter 2 Beginning the Installation 56...
Page 70: ...Chapter 4 Installing the GS970EMX 20 Switch in an Equipment Rack 70...
Page 104: ...Chapter 8 Verifying the Switch 104...
Page 116: ...Chapter 10 Troubleshooting 116...