
165
Chapter 13
Building the Stack with Copper or SFP
Gigabit Ports
This chapter explains how to build a stack of x930 Switches using front
panel copper or SFP Gigabit ports as the trunk. The chapter contains the
following sections:
“Configuring the Master Switch” on page 170
“Configuring the Member Switches” on page 177
Summary of Contents for AT-x930-28GPX
Page 8: ...Contents 8...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 82: ...Chapter 2 Virtual Chassis Stacking 82...
Page 92: ...Chapter 3 Beginning the Installation 92...