x930 Series Installation Guide for Virtual Chassis Stacking
143
Figure 72. Management Workstation, VT-Kit3 Management Cable, and
Switch
This procedure explains how to start a local management session on the
switch with the management cable included with the device. For
instructions on how to start a remote management session, refer to the
x330 Series Software Reference for AlliedWare Plus Operating System
.
To start a local management session using the management cable
provided with the switch, perform the following procedure:
1. Power on one of the switches by doing one of the following:
If the switch has an AC power supply, connect the AC power cord
to the power supply on the back panel and to an AC power source.
if the switch has two power supplies, you need to power on only
one of them for this procedure.
If the switch has the DC AT-PWR250-80 Power Supply, power on
the DC circuit and the On/Off switch on the power supply. (If you
have not yet wired the DC connector on the power supply, refer to
Chapter 9, “Wiring the DC Connector on the AT-PWR250-80
2. Wait one minute for the switch to initialize its management software.
3. Connect the RJ-45 connector on the management cable to the
Console port on the front panel of the switch. Refer to Figure 73 on
Summary of Contents for AT-x930-28GPX
Page 8: ...Contents 8...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 82: ...Chapter 2 Virtual Chassis Stacking 82...
Page 92: ...Chapter 3 Beginning the Installation 92...