SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
263
Figure 161. Loosening the Screw on the Locking Handle
Note
If the power wires are connected to the terminal block with the right
angle terminals, go to step 5.
4. Use a #1 screwdriver to loosen the two screws that secure the plastic
cover over the terminal block and slide the cover to the right. You may
need to slightly lift the locking handle to access the bottom screw.
Refer to Figure 162.
The plastic cover may not be present if the lead wires are connected to
the terminal block with the right angle terminals. If this is the case, you
may skip this step.
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...