
105
Chapter 10
Powering On the Stack
This chapter contains the following procedures:
“Powering On the Switches Individually” on page 106
“Powering On the Switches Simultaneously” on page 108
“Verifying the Stack” on page 110
“Monitoring the Stack Initialization Processes” on page 113
Perform “Powering On the Switches Individually” on page 106 if you want
to control the assignment of the ID numbers to the switches of the stack.
The numbers are assigned in the order in which you power on the units.
Otherwise, perform “Powering On the Switches Simultaneously” on
page 108 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the AT-IE510-28GSX Command
Reference on AlliedTelesis.com.
Note
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units.
Summary of Contents for AT-IE510-28GSX
Page 1: ...613 002101 Rev C AT IE510 28GSX Industrial Ethernet Switch Installation Guide ...
Page 6: ...6 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 44: ...Chapter 2 Virtual Chassis Stacking 44 ...
Page 60: ...Chapter 4 Mounting the Switch 60 ...
Page 72: ...Chapter 5 Wiring the DC Connectors 72 ...
Page 78: ...Chapter 6 Installing SFP and SFP Transceivers 78 ...
Page 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88 ...
Page 116: ...Chapter 10 Powering On the Stack 116 ...
Page 120: ...Chapter 11 Troubleshooting 120 ...