
AT-IE510 Series Installation Guide
71
Monitoring the Switch Initialization Process
It takes about thirty seconds to initialize the management software. To
monitor the initialization process, do one of the following:
Watch the switch ID LED. It displays the number “8” for about the
first 15 seconds and then the number “1.”
Connect a terminal, or a computer that has a terminal emulator
program, to the Console port on the switch. The bootup sequence
is complete when the “awplus login” prompt appears.
After the switch is initialized, do one of the following:
If you are installing a VCStack, go to Chapter 8, “Verifying the
Status of VCStack” on page 89.
If you are installing a stand-alone switch, go to Chapter 7,
“Configuring the Switch for Stand-alone Operations” on page 79.
Summary of Contents for AT-IE510-28GSX-80
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 44: ...Chapter 2 Virtual Chassis Stacking 44...
Page 60: ...Chapter 4 Mounting the Switch 60...
Page 72: ...Chapter 5 Wiring the DC Connectors 72...
Page 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Page 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Page 116: ...Chapter 10 Powering On the Stack 116...
Page 120: ...Chapter 11 Troubleshooting 120...