Chapter 9: Cabling the Stacking Ports
100
Figure 60. Installing a TwinAx Cable in Slot S2
8. Repeat this procedure to connect additional switches to the stack with
TwinAx cables.
9. To create the redundant path with the ring topology shown in Figure 12
on page 40 and Figure 13 on page 41, connect a cable to the empty
stacking slots on the top and bottom switches.
10. After connecting the cables to all of the switches, go to Chapter 10,